ONSHORE WIND Β· PJM

Onshore wind project Y3-111, Erie County

Onshore wind project Y3-111, Erie County is a 18.7 MW onshore wind request withdrawn in the PJM interconnection queue, in Erie County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedSep 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Y3-111
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Harborcreek Township 34kV
Location
Erie County, Pennsylvania
Technology
Wind: 18.7 MW
Total requested
18.7 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
April 2014
Withdrawn
September 2013

Location

Marker shows the centre of Erie County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Erie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem