Trafalgar 2

Trafalgar 2 is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1265
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
ARCO-Tulare Lake Line
Location
Kings County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
March 2019
Withdrawn
May 2017

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.