Niles A CT is a 1.5 MW other request built and operating in the PJM interconnection queue, in Trumbull County, Ohio, connecting to ATSI.
Request details
- Queue ID
- AF1-189
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Niles CT A 23 kV
- Location
- Trumbull County, Ohio
- Technology
- Oil: 1.5 MW
- Total requested
- 1.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 25 September 2019
- Proposed online date
- September 2023
- Came online
- July 2020
Location
Marker shows the centre of Trumbull County; the queue data does not give exact sites.
Other requests in Trumbull County
- Trumbull Energy CenterGas Β· 940 MW Β· agreement signed
- Gas project AJ1-023, Trumbull CountyGas Β· 70.0 MW Β· in study
- Solar + storage project AH2-239, Trumbull CountySolar + storage Β· 49.0 MW Β· in study
- Gas project AH1-706, Trumbull CountyGas Β· 30.5 MW Β· in study
- Lordstown Energy CenterGas Β· 800 MW Β· built
- Lordstown Energy CenterGas Β· 140 MW Β· built
- Warren Natural Gas Generation FaciilityGas Β· 16.5 MW Β· built
- Gas project AE1-213, Trumbull CountyGas Β· 1,170 MW Β· withdrawn
- Gas project AE2-013, Trumbull CountyGas Β· 1,170 MW Β· withdrawn
- Gas project AD2-057, Trumbull CountyGas Β· 940 MW Β· withdrawn
- Gas project Z1-034, Trumbull CountyGas Β· 217 MW Β· withdrawn
- Onshore wind project H091, Trumbull CountyOnshore wind Β· 101 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem