United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

GAS Β· PJM

Gas project AE1-213, Trumbull County

Gas project AE1-213, Trumbull County is a 1,170 MW gas request withdrawn in the PJM interconnection queue, in Trumbull County, Ohio, connecting to ATSI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2018 (completed)
  2. Withdrawn / abandonedOct 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE1-213
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Connection point (POI)
Highland-Lordstown 1 & 2 345 kV
Location
Trumbull County, Ohio
Technology
Gas: 1,170 MW
Total requested
1,170 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
26 September 2018
Proposed online date
November 2023
Withdrawn
October 2018

Location

Marker shows the centre of Trumbull County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Trumbull County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem