United States › Grid › Interconnection queues › Illinois
ONSHORE WIND · PJMTop Crop Wind Farm
Top Crop Wind Farm is a 300 MW onshore wind request withdrawn in the PJM interconnection queue, in Livingston County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2005 (completed)
- Withdrawn / abandonedJul 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- O23
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Powerton-Dresden 345kV
- Location
- Livingston County, Illinois
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 11 May 2005
- Proposed online date
- December 2013
- Withdrawn
- July 2013
Location
Marker shows the centre of Livingston County; the queue data does not give exact sites.
Other requests in Livingston County
- Blooming Grove Solar Energy CenterSolar · 200 MW · agreement signed
- Battery storage project AH2-416, Livingston CountyBattery storage · 450 MW · in study
- Battery storage project AH2-415, Livingston CountyBattery storage · 300 MW · in study
- Livingston WindOnshore wind · 255 MW · in study
- Solar + storage project AH2-113, Livingston CountySolar + storage · 250 MW · in study
- Solar + storage project AH1-543, Livingston CountySolar + storage · 157 MW · in study
- Solar project AG2-114, Livingston CountySolar · 100 MW · in study
- Top Crop Generating FacilityOnshore wind · 300 MW · built
- Cayuga Ridge South WFOnshore wind · 300 MW · built
- Bright Stalk Generating FacilityOnshore wind · 200 MW · built
- Otter Creek Wind FarmOnshore wind · 150 MW · built
- Livingston Landfill Gas to Energy FacilityOther · 13.3 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem