United States › Grid › Interconnection queues › Illinois

ONSHORE WIND · PJM

Bright Stalk Generating Facility

Bright Stalk Generating Facility is a 200 MW onshore wind request built and operating in the PJM interconnection queue, in Livingston County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Apr 2014 (completed)
  2. ConsentedSep 2017 (completed)
  3. Construction (completed)
  4. OperatingDec 2019 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Z2-087
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Pontiac MidPoint-Brokaw 345kV
Location
Livingston County, Illinois
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
29 April 2014
Agreement signed
3 September 2017
Proposed online date
December 2019
Came online
December 2019

Location

Marker shows the centre of Livingston County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Livingston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem