United States › Grid › Interconnection queues › Illinois

OTHER · PJM

Livingston Landfill Gas to Energy Facility

Livingston Landfill Gas to Energy Facility is a 13.3 MW other request built and operating in the PJM interconnection queue, in Livingston County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Apr 2014 (completed)
  2. ConsentedJul 2016 (completed)
  3. Construction (completed)
  4. OperatingApr 2017 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Z2-081
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Streator 34.5kV
Location
Livingston County, Illinois
Technology
Other: 13.3 MW
Total requested
13.3 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
28 April 2014
Agreement signed
1 July 2016
Proposed online date
December 2014
Came online
April 2017

Location

Marker shows the centre of Livingston County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Livingston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem