United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
BATTERY STORAGE Β· SPPBattery storage project GEN-2023-SR11, Beaver County
Battery storage project GEN-2023-SR11, Beaver County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Beaver County, Oklahoma, connecting to OG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedDec 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingJun 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-SR11
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OG&E
- Connection point (POI)
- Beaver County 345 kV Substation
- Location
- Beaver County, Oklahoma
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 13 February 2023
- Proposed online date
- June 2025
- Came online
- June 2025
- Withdrawn
- December 2023
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Other requests in Beaver County
- Battery storage project GEN-2025-SR28, Beaver CountyBattery storage Β· 263 MW Β· in study
- Solar project GEN-2024-SR7, Beaver CountySolar Β· 200 MW Β· in study
- Battery storage project GEN-2024-SR9, Beaver CountyBattery storage Β· 150 MW Β· in study
- Onshore wind project GEN-2010-001, Beaver CountyOnshore wind Β· 300 MW Β· built
- Onshore wind project GEN-2008-047, Beaver CountyOnshore wind Β· 263 MW Β· built
- Onshore wind project GEN-2015-082, Beaver CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project GEN-2011-014, Beaver CountyOnshore wind Β· 198 MW Β· built
- Onshore wind project GEN-2017-047, Beaver CountyOnshore wind Β· 102 MW Β· built
- Other project GEN-2017-062, Beaver CountyOther Β· 488 MW Β· withdrawn
- Onshore wind project GEN-2009-069, Beaver CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2016-001, Beaver CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2008-090, Beaver CountyOnshore wind Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem