United States › Grid › Interconnection queues › Oklahoma
SOLAR · SPPSolar project GEN-2024-SR7, Beaver County
Solar project GEN-2024-SR7, Beaver County is a 200 MW solar request in interconnection study in the SPP interconnection queue, in Beaver County, Oklahoma, connecting to OG&E.
Queue statusIn planning
- PlanningQueued Jan 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-SR7
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OG&E
- Connection point (POI)
- Beaver County Substation 345 kV
- Location
- Beaver County, Oklahoma
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA PENDING
- Queue status
- Active
- Entered queue
- 26 January 2024
- Proposed online date
- June 2027
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Other requests in Beaver County
- Battery storage project GEN-2025-SR28, Beaver CountyBattery storage · 263 MW · in study
- Battery storage project GEN-2024-SR9, Beaver CountyBattery storage · 150 MW · in study
- Onshore wind project GEN-2010-001, Beaver CountyOnshore wind · 300 MW · built
- Onshore wind project GEN-2008-047, Beaver CountyOnshore wind · 263 MW · built
- Onshore wind project GEN-2015-082, Beaver CountyOnshore wind · 200 MW · built
- Onshore wind project GEN-2011-014, Beaver CountyOnshore wind · 198 MW · built
- Onshore wind project GEN-2017-047, Beaver CountyOnshore wind · 102 MW · built
- Other project GEN-2017-062, Beaver CountyOther · 488 MW · withdrawn
- Onshore wind project GEN-2009-069, Beaver CountyOnshore wind · 400 MW · withdrawn
- Onshore wind project GEN-2016-001, Beaver CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project GEN-2008-090, Beaver CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project GEN-2014-052, Beaver CountyOnshore wind · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem