United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
OTHER Β· SPPOther project GEN-2017-062, Beaver County
Other project GEN-2017-062, Beaver County is a 488 MW other request withdrawn in the SPP interconnection queue, in Beaver County, Oklahoma, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedOct 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-062
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Tap 765kV line between proposed Twin Counties to Tulsa North substation
- Location
- Beaver County, Oklahoma
- Technology
- Other: 488 MW
- Total requested
- 488 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 31 May 2017
- Proposed online date
- December 2022
- Withdrawn
- October 2018
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Other requests in Beaver County
- Battery storage project GEN-2025-SR28, Beaver CountyBattery storage Β· 263 MW Β· in study
- Solar project GEN-2024-SR7, Beaver CountySolar Β· 200 MW Β· in study
- Battery storage project GEN-2024-SR9, Beaver CountyBattery storage Β· 150 MW Β· in study
- Onshore wind project GEN-2010-001, Beaver CountyOnshore wind Β· 300 MW Β· built
- Onshore wind project GEN-2008-047, Beaver CountyOnshore wind Β· 263 MW Β· built
- Onshore wind project GEN-2015-082, Beaver CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project GEN-2011-014, Beaver CountyOnshore wind Β· 198 MW Β· built
- Onshore wind project GEN-2017-047, Beaver CountyOnshore wind Β· 102 MW Β· built
- Onshore wind project GEN-2009-069, Beaver CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GEN-2016-001, Beaver CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2008-090, Beaver CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2014-052, Beaver CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem