United States › Grid › Interconnection queues › Ohio

BATTERY STORAGE · PJM

138kV Bus 5 Beckjord Battery

138kV Bus 5 Beckjord Battery is a 19.8 MW battery storage request withdrawn in the PJM interconnection queue, in Clermont County, Ohio, connecting to DEOK.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2016 (completed)
  2. Withdrawn / abandonedDec 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AB2-178
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DEOK
Connection point (POI)
Beckjord 138kV
Location
Clermont County, Ohio
Technology
Battery: 19.8 MW
Total requested
19.8 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
29 April 2016
Proposed online date
November 2018
Withdrawn
December 2019

Location

Marker shows the centre of Clermont County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Clermont County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem