BATTERY STORAGE · PJM

Beckjord Battery #2

Beckjord Battery #2 is a 2.0 MW battery storage request built and operating in the PJM interconnection queue, in Clermont County, Ohio, connecting to DEOK.

Queue statusOperating
  1. PlanningQueued Apr 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2015 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y3-100
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DEOK
Connection point (POI)
Beckjord 2 MW-2
Location
Clermont County, Ohio
Technology
Battery: 2.0 MW
Total requested
2.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
29 April 2013
Proposed online date
October 2015
Came online
November 2015

Location

Marker shows the centre of Clermont County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Clermont County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem