Solar project 26, Pasco County

Solar project 26, Pasco County is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Pasco County, Florida, connecting to Tampa Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tampa Electric Company
Connection point (POI)
Blanton Substation, Pasco County, Florida
Location
Pasco County, Florida
Technology
Solar: 74.5 MW
Total requested
74.5 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
24 April 2017
Proposed online date
June 2020

Location

Marker shows the centre of Pasco County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Pasco County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem