GAS Β· SOUTHEASTGas project 93, Pasco County
Gas project 93, Pasco County is a 650 MW gas request withdrawn in the Southeast interconnection queue, in Pasco County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 93
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Hudson Substation
- Location
- Pasco County, Florida
- Technology
- Gas: 650 MW
- Total requested
- 650 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 8 August 2008
- Proposed online date
- June 2013
Location
Marker shows the centre of Pasco County; the queue data does not give exact sites.
Other requests in Pasco County
- Gas project 137, Pasco CountyGas Β· 575 MW Β· under construction
- Battery storage project FC100009, Pasco CountyBattery storage Β· 199 MW Β· in study
- Solar project 237, Pasco CountySolar Β· 74.5 MW Β· in study
- Other project FC100000, Pasco CountyOther Β· 13.1 MW Β· in study
- Gas project 5, Pasco CountyGas Β· 480 MW Β· built
- Solar project 71, Pasco CountySolar Β· 74.9 MW Β· built
- Solar project 2, Pasco CountySolar Β· 54.6 MW Β· built
- Gas project 53, Pasco CountyGas Β· 10.0 MW Β· built
- Gas project 55, Pasco CountyGas Β· 10.0 MW Β· built
- Gas project 110, Pasco CountyGas Β· 1,400 MW Β· withdrawn
- Gas project 109, Pasco CountyGas Β· 1,400 MW Β· withdrawn
- Other project 129, Pasco CountyOther Β· 400 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem