United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 556, Bradford County
Solar project 556, Bradford County is a 74.9 MW solar request withdrawn in the Southeast interconnection queue, in Bradford County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 556
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- Deerhaven (GVL)-Bradford 138kV
- Location
- Bradford County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 23 February 2023
- Proposed online date
- December 2026
Location
Marker shows the centre of Bradford County; the queue data does not give exact sites.
Other requests in Bradford County
- Solar + storage project 425, Bradford CountySolar + storage Β· 74.9 MW Β· agreement signed
- Solar project 557, Bradford CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 138B, Bradford CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 555, Bradford CountySolar Β· 74.9 MW Β· withdrawn
- Solar + storage project 346, Bradford CountySolar + storage Β· 74.5 MW Β· withdrawn
- Solar project 554, Bradford CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem