πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

SOLAR + STORAGE Β· SOUTHEAST

Solar + storage project 346, Bradford County

Solar + storage project 346, Bradford County is a 74.5 MW solar + storage request withdrawn in the Southeast interconnection queue, in Bradford County, Florida, connecting to Florida Power & Light.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2022 (not reached)
  6. Closed (not reached)

Request details

Queue ID
346
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Florida Power & Light
Developer
Third Party
Connection point (POI)
Bradford-Quasar 230kV
Location
Bradford County, Florida
Technology
Solar: 74.5 MW Β· Battery
Total requested
74.5 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
4 May 2018
Proposed online date
June 2022
Came online
June 2022

Location

Marker shows the centre of Bradford County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Bradford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem