SOLAR Β· MISOSolar project J735, Morrison County
Solar project J735, Morrison County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Morrison County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedJul 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J735
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Morrison County, Minnesota
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 10 November 2016
- Proposed online date
- August 2019
- Withdrawn
- July 2017
Location
Marker shows the centre of Morrison County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Morrison County
- Solar project J1611, Morrison CountySolar Β· 174 MW Β· in study
- Onshore wind project J4157, Morrison CountyOnshore wind Β· 150 MW Β· in study
- Onshore wind project J042, Morrison CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project J1143, Morrison CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project G596, Morrison CountyOnshore wind Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem