United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J1143, Morrison County
Solar project J1143, Morrison County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Morrison County, Minnesota, connecting to MINNESOTA POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1143
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MINNESOTA POWER
- Connection point (POI)
- Blanchard - Little Falls 115 kV Line
- Location
- Morrison County, Minnesota
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- August 2020
- Withdrawn
- March 2020
Location
Marker shows the centre of Morrison County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Morrison County
- Solar project J1611, Morrison CountySolar Β· 174 MW Β· in study
- Onshore wind project J4157, Morrison CountyOnshore wind Β· 150 MW Β· in study
- Onshore wind project J042, Morrison CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project J735, Morrison CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project G596, Morrison CountyOnshore wind Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem