United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Tynan BESS1

Tynan BESS1 is a 9.9 MW battery storage request built and operating in the ERCOT interconnection queue, in Bee County, Texas.

Queue statusOperating
  1. PlanningQueued May 2024 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingFeb 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
24INR0759
Grid region
ERCOT (Texas)
Developer
HEN INFRASTRUCTURE, LLC 1
Connection point (POI)
STATION: TYNAN/LOAD: LOAD1/NODE: LD01
Location
Bee County, Texas
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
MRD Approved
Queue status
Operational
Entered queue
21 May 2024
Proposed online date
April 2025
Came online
February 2025

Location

Marker shows the centre of Bee County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Bee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem