United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

SOLAR Β· PJM

Solar project AD1-153, Prince George's County

Solar project AD1-153, Prince George's County is a 2.8 MW solar request withdrawn in the PJM interconnection queue, in Prince George's County, Maryland, connecting to PEPCO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2017 (completed)
  2. Withdrawn / abandonedDec 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AD1-153
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PEPCO
Connection point (POI)
Walker Mill 12 kV
Location
Prince George's County, Maryland
Technology
Solar: 2.8 MW
Total requested
2.8 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
30 September 2017
Proposed online date
September 2018
Withdrawn
December 2018

Location

Marker shows the centre of Prince George's County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Prince George's County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem