United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR Β· PJMSolar project X2-093, Livingston County
Solar project X2-093, Livingston County is a 10.0 MW solar request withdrawn in the PJM interconnection queue, in Livingston County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2011 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X2-093
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Pontiac-Midpoint 34.5kV
- Location
- Livingston County, Illinois
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 29 July 2011
- Proposed online date
- July 2013
- Withdrawn
- July 2012
Location
Marker shows the centre of Livingston County; the queue data does not give exact sites.
Other requests in Livingston County
- Blooming Grove Solar Energy CenterSolar Β· 200 MW Β· agreement signed
- Battery storage project AH2-416, Livingston CountyBattery storage Β· 450 MW Β· in study
- Battery storage project AH2-415, Livingston CountyBattery storage Β· 300 MW Β· in study
- Livingston WindOnshore wind Β· 255 MW Β· in study
- Solar + storage project AH2-113, Livingston CountySolar + storage Β· 250 MW Β· in study
- Solar + storage project AH1-543, Livingston CountySolar + storage Β· 157 MW Β· in study
- Solar project AG2-114, Livingston CountySolar Β· 100 MW Β· in study
- Top Crop Generating FacilityOnshore wind Β· 300 MW Β· built
- Cayuga Ridge South WFOnshore wind Β· 300 MW Β· built
- Bright Stalk Generating FacilityOnshore wind Β· 200 MW Β· built
- Otter Creek Wind FarmOnshore wind Β· 150 MW Β· built
- Livingston Landfill Gas to Energy FacilityOther Β· 13.3 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem