ONSHORE WIND Β· MISO

Onshore wind project R53, Adair County

Onshore wind project R53, Adair County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Adair County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedNov 2011 (project stopped here)
  3. ConsentedNov 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R53
Grid region
MISO (Midcontinent)
Connection point (POI)
Atlantic - Earlham 161 kV
Location
Adair County, Iowa
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
DPP - SIS
Queue status
Withdrawn
Entered queue
18 March 2008
Agreement signed
1 November 2011
Proposed online date
October 2010
Withdrawn
November 2011

Location

Marker shows the centre of Adair County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Adair County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem