Gas project J3553, Adair County

Gas project J3553, Adair County is a 263 MW gas request withdrawn in the MISO interconnection queue, in Adair County, Iowa, connecting to MIDAMERICAN ENERGY CO..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3553
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY CO.
Connection point (POI)
Orient Energy Center Substation
Location
Adair County, Iowa
Technology
Gas: 263 MW
Total requested
263 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
18 April 2024
Proposed online date
November 2028
Withdrawn
December 2025

Location

Marker shows the centre of Adair County; the queue data does not give exact sites.