United States › Grid › Interconnection queues › Iowa
ONSHORE WIND · MISOOnshore wind project J499, Adair County
Onshore wind project J499, Adair County is a 340 MW onshore wind request built and operating in the MISO interconnection queue, in Adair County, Iowa.
Request details
- Queue ID
- J499
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- MEC 345 kV Fallow-Grimes line (18 miles east of Fallow substation)
- Location
- Adair County, Iowa
- Technology
- Wind: 340 MW
- Total requested
- 340 MW
- Study phase
- GIA
- Queue status
- Operational
- Entered queue
- 13 November 2015
- Agreement signed
- 8 February 2019
- Proposed online date
- March 2016
- Came online
- March 2016
Location
Marker shows the centre of Adair County; the queue data does not give exact sites.
Other requests in Adair County
- Orient Energy CenterGas · 265 MW · in study
- Surplus; J500Gas · 263 MW · in study
- Gas project J3047, Adair CountyGas · 263 MW · in study
- Onshore wind project J500, Adair CountyOnshore wind · 500 MW · built
- Onshore wind project J527, Adair CountyOnshore wind · 250 MW · built
- Onshore wind project R38, Adair CountyOnshore wind · 200 MW · built
- Onshore wind project R41, Adair CountyOnshore wind · 100 MW · built
- Gas project J355, Adair CountyGas · 810 MW · withdrawn
- Onshore wind project R52, Adair CountyOnshore wind · 500 MW · withdrawn
- Gas project J364, Adair CountyGas · 464 MW · withdrawn
- Gas project J3553, Adair CountyGas · 263 MW · withdrawn
- Onshore wind project J528, Adair CountyOnshore wind · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem