United States › Grid › Interconnection queues › Iowa
ONSHORE WIND · MISOOnshore wind project R38, Adair County
Onshore wind project R38, Adair County is a 200 MW onshore wind request built and operating in the MISO interconnection queue, in Adair County, Iowa.
Request details
- Queue ID
- R38
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- MEC Council Bluffs - Grimes 345 kV
- Location
- Adair County, Iowa
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 23 February 2007
- Agreement signed
- 31 August 2009
- Proposed online date
- June 2008
- Came online
- June 2008
Location
Marker shows the centre of Adair County; the queue data does not give exact sites.
Other requests in Adair County
- Orient Energy CenterGas · 265 MW · in study
- Surplus; J500Gas · 263 MW · in study
- Gas project J3047, Adair CountyGas · 263 MW · in study
- Onshore wind project J500, Adair CountyOnshore wind · 500 MW · built
- Onshore wind project J499, Adair CountyOnshore wind · 340 MW · built
- Onshore wind project J527, Adair CountyOnshore wind · 250 MW · built
- Onshore wind project R41, Adair CountyOnshore wind · 100 MW · built
- Gas project J355, Adair CountyGas · 810 MW · withdrawn
- Onshore wind project R52, Adair CountyOnshore wind · 500 MW · withdrawn
- Gas project J364, Adair CountyGas · 464 MW · withdrawn
- Gas project J3553, Adair CountyGas · 263 MW · withdrawn
- Onshore wind project J528, Adair CountyOnshore wind · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem