United States › Grid › Interconnection queues › Iowa

GAS · MISO

Gas project J3047, Adair County

Gas project J3047, Adair County is a 263 MW gas request in interconnection study in the MISO interconnection queue, in Adair County, Iowa, connecting to MIDAMERICAN ENERGY CO..

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J3047
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY CO.
Connection point (POI)
ORIENT - NORTHBORO 345.0kV
Location
Adair County, Iowa
Technology
Gas: 263 MW
Total requested
263 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
15 September 2022
Proposed online date
September 2027

Location

Marker shows the centre of Adair County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Adair County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem