United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project R52, Adair County
Onshore wind project R52, Adair County is a 500 MW onshore wind request withdrawn in the MISO interconnection queue, in Adair County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2008 (completed)
- Withdrawn / abandonedNov 2011 (project stopped here)
- ConsentedNov 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R52
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- MEC Council Bluffs - Madison 345 kV
- Location
- Adair County, Iowa
- Technology
- Wind: 500 MW
- Total requested
- 500 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 18 March 2008
- Agreement signed
- 1 November 2011
- Proposed online date
- October 2010
- Withdrawn
- November 2011
Location
Marker shows the centre of Adair County; the queue data does not give exact sites.
Other requests in Adair County
- Orient Energy CenterGas Β· 265 MW Β· in study
- Surplus; J500Gas Β· 263 MW Β· in study
- Gas project J3047, Adair CountyGas Β· 263 MW Β· in study
- Onshore wind project J500, Adair CountyOnshore wind Β· 500 MW Β· built
- Onshore wind project J499, Adair CountyOnshore wind Β· 340 MW Β· built
- Onshore wind project J527, Adair CountyOnshore wind Β· 250 MW Β· built
- Onshore wind project R38, Adair CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project R41, Adair CountyOnshore wind Β· 100 MW Β· built
- Gas project J355, Adair CountyGas Β· 810 MW Β· withdrawn
- Gas project J364, Adair CountyGas Β· 464 MW Β· withdrawn
- Gas project J3553, Adair CountyGas Β· 263 MW Β· withdrawn
- Onshore wind project J528, Adair CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem