πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

GAS Β· PJM

Renovo Energy Center

Renovo Energy Center is a 463 MW gas request withdrawn in the PJM interconnection queue, in Clinton County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2014 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. ConsentedOct 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AA1-111
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Moshannon-East Towanda 230kV
Location
Clinton County, Pennsylvania
Technology
Gas: 463 MW
Total requested
463 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
31 October 2014
Agreement signed
20 October 2021
Proposed online date
June 2025
Withdrawn
April 2023

Location

Marker shows the centre of Clinton County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Clinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem