Onshore wind project Q40, Clinton County

Onshore wind project Q40, Clinton County is a 40.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Clinton County, Pennsylvania, connecting to PPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2006 (completed)
  2. Withdrawn / abandonedAug 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q40
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Connection point (POI)
Renovo Lock Haven
Location
Clinton County, Pennsylvania
Technology
Wind: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
Queue status
Withdrawn
Entered queue
15 May 2006
Proposed online date
June 2009
Withdrawn
August 2008

Location

Marker shows the centre of Clinton County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Clinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem