🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Maryland

SOLAR · PJM

Catoctin Furnace Solar Facility

Catoctin Furnace Solar Facility is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Frederick County, Maryland, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2016 (completed)
  2. Withdrawn / abandonedFeb 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC1-039
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Catoctin 34kV
Location
Frederick County, Maryland
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
31 August 2016
Proposed online date
October 2018
Withdrawn
February 2021

Location

Marker shows the centre of Frederick County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Frederick County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem