United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

SOLAR Β· SPP

Solar project GEN-2012-022, Lea County

Solar project GEN-2012-022, Lea County is a 30.0 MW solar request withdrawn in the SPP interconnection queue, in Lea County, New Mexico, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2012 (completed)
  2. Withdrawn / abandonedFeb 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2012-022
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Ochoa 115kV
Location
Lea County, New Mexico
Technology
Solar: 30.0 MW
Total requested
30.0 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 September 2012
Proposed online date
December 2014
Withdrawn
February 2013

Location

Marker shows the centre of Lea County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Lea County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem