United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 205, Levy County
Solar project 205, Levy County is a 74.9 MW solar request withdrawn in the Southeast interconnection queue, in Levy County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 205
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Bronson-Newberry Line
- Location
- Levy County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 22 November 2017
- Proposed online date
- October 2021
Location
Marker shows the centre of Levy County; the queue data does not give exact sites.
Other requests in Levy County
- Solar project 202.1, Levy CountySolar Β· 74.9 MW Β· under construction
- Solar project 193, Levy CountySolar Β· 70.0 MW Β· in study
- Solar project 314, Levy CountySolar Β· 74.5 MW Β· suspended
- Solar project 315, Levy CountySolar Β· 74.5 MW Β· suspended
- Solar project 240, Levy CountySolar Β· 74.9 MW Β· built
- Solar project 173, Levy CountySolar Β· 74.5 MW Β· built
- Other project 118, Levy CountyOther Β· 1,211 MW Β· withdrawn
- Other project 119, Levy CountyOther Β· 1,211 MW Β· withdrawn
- Nuclear project 46, Levy CountyNuclear Β· 1,150 MW Β· withdrawn
- Nuclear project 104, Levy CountyNuclear Β· 1,150 MW Β· withdrawn
- Nuclear project 32, Levy CountyNuclear Β· 1,150 MW Β· withdrawn
- Gas project 87, Levy CountyGas Β· 418 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem