SOLAR · SOUTHEASTSolar project 240, Levy County
Solar project 240, Levy County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Levy County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 240
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Chiefland Substation
- Location
- Levy County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 12 October 2018
- Proposed online date
- April 2023
- Came online
- April 2023
Location
Marker shows the centre of Levy County; the queue data does not give exact sites.
Other requests in Levy County
- Solar project 202.1, Levy CountySolar · 74.9 MW · under construction
- Solar project 193, Levy CountySolar · 70.0 MW · in study
- Solar project 314, Levy CountySolar · 74.5 MW · suspended
- Solar project 315, Levy CountySolar · 74.5 MW · suspended
- Solar project 173, Levy CountySolar · 74.5 MW · built
- Other project 118, Levy CountyOther · 1,211 MW · withdrawn
- Other project 119, Levy CountyOther · 1,211 MW · withdrawn
- Nuclear project 46, Levy CountyNuclear · 1,150 MW · withdrawn
- Nuclear project 104, Levy CountyNuclear · 1,150 MW · withdrawn
- Nuclear project 32, Levy CountyNuclear · 1,150 MW · withdrawn
- Gas project 87, Levy CountyGas · 418 MW · withdrawn
- Gas project 82, Levy CountyGas · 418 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem