United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

NUCLEAR Β· SOUTHEAST

Nuclear project 46, Levy County

Nuclear project 46, Levy County is a 1,150 MW nuclear request withdrawn in the Southeast interconnection queue, in Levy County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
46
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Duke Energy Florida, LLC
Connection point (POI)
PEF Nuclear Substation
Location
Levy County, Florida
Technology
Nuclear: 1,150 MW
Total requested
1,150 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
12 December 2006
Proposed online date
June 2018

Location

Marker shows the centre of Levy County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Levy County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem