Hamby Solar 1 is a 206 MW solar request withdrawn in the ERCOT interconnection queue, in Taylor County, Texas.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 28INR0425
- Grid region
- ERCOT (Texas)
- Developer
- Abilene GCE LLC
- Connection point (POI)
- 6245 Abilene Robertson Prison
- Location
- Taylor County, Texas
- Technology
- Solar: 206 MW
- Total requested
- 206 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- July 2028
- Withdrawn
- July 2025
Location
Marker shows the centre of Taylor County; the queue data does not give exact sites.
Other requests in Taylor County
- Buffalo Gap 3 Wind RepowerOnshore wind Β· 169 MW Β· agreement signed
- Horse13 CallD repowerOnshore wind Β· 44.0 MW Β· agreement signed
- HHGT repower Horse13+CallDOnshore wind Β· 44.0 MW Β· agreement signed
- Abilene Elmcreek BESSBattery storage Β· 9.9 MW Β· agreement signed
- Abilene Industrial Park BESSBattery storage Β· 9.9 MW Β· agreement signed
- Dog Star Solar IISolar Β· 503 MW Β· in study
- Dog Star Solar ISolar Β· 503 MW Β· in study
- Forts Trail BESSSolar + storage Β· 209 MW Β· in study
- Forts Trail BESS 2Solar + storage Β· 206 MW Β· in study
- Taylor County Paul StorageBattery storage Β· 205 MW Β· in study
- Forts Trail SolarSolar + storage Β· 201 MW Β· in study
- Chimney Rock BESSBattery storage Β· 156 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem