Solar project GEN-2018-092, Foard County

Solar project GEN-2018-092, Foard County is a 400 MW solar request withdrawn in the SPP interconnection queue, in Foard County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-092
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Oklaunion-Tuco 345kV Line Break
Location
Foard County, Texas
Technology
Solar: 400 MW
Total requested
400 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
December 2027
Withdrawn
September 2023

Location

Marker shows the centre of Foard County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Foard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem