United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project X2-082, Chesterfield County
Gas project X2-082, Chesterfield County is a 1,575 MW gas request withdrawn in the PJM interconnection queue, in Chesterfield County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2011 (completed)
- Withdrawn / abandonedDec 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X2-082
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Chesterfield 230kV
- Location
- Chesterfield County, Virginia
- Technology
- Gas: 1,575 MW
- Total requested
- 1,575 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Interim Study
- Queue status
- Withdrawn
- Entered queue
- 28 July 2011
- Proposed online date
- December 2015
- Withdrawn
- December 2012
Location
Marker shows the centre of Chesterfield County; the queue data does not give exact sites.
Other requests in Chesterfield County
- Chesterfield CT Units 3&4Gas Β· 569 MW Β· agreement signed
- Chester SolarSolar Β· 120 MW Β· agreement signed
- Chester Solar Technology ParkSolar Β· 20.0 MW Β· agreement signed
- Winterpock ISolar Β· 20.0 MW Β· agreement signed
- Harrowgate 1Solar Β· 20.0 MW Β· agreement signed
- Chesterfield CT Units 1 and 2Gas Β· 569 MW Β· in study
- Battery storage project AG2-088, Chesterfield CountyBattery storage Β· 150 MW Β· in study
- Battery storage project AG2-384, Chesterfield CountyBattery storage Β· 60.8 MW Β· in study
- 360 Solar Center, LLCSolar Β· 26.0 MW Β· in study
- 360 Solar Center, LLCSolar Β· 26.0 MW Β· in study
- Chesterfield Unit #6Coal Β· 27.0 MW Β· built
- Dry Bridge Energy CenterBattery storage Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem