GAS · ISO-NE

Pioneer Valley Energy Center

Pioneer Valley Energy Center is a 353 MW gas request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2007 (completed)
  2. Withdrawn / abandonedNov 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
236
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV line between Buck Pond and Pochassic substa
Location
Hampden County, Massachusetts
Technology
Gas: 353 MW · Oil
Total requested
353 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
30 November 2007
Proposed online date
September 2015
Withdrawn
November 2012

Location

Marker shows the centre of Hampden County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Hampden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem