United States › Grid › Interconnection queues › Massachusetts
GAS · ISO-NEPioneer Valley Energy Center
Pioneer Valley Energy Center is a 353 MW gas request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2007 (completed)
- Withdrawn / abandonedNov 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 236
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV line between Buck Pond and Pochassic substa
- Location
- Hampden County, Massachusetts
- Technology
- Gas: 353 MW · Oil
- Total requested
- 353 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Withdrawn
- Entered queue
- 30 November 2007
- Proposed online date
- September 2015
- Withdrawn
- November 2012
Location
Marker shows the centre of Hampden County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Hampden County
- West Springfield 45 MW BESSBattery storage · 45.0 MW · agreement signed
- Battery StorageBattery storage · 250 MW · in study
- Battery StorageBattery storage · 170 MW · in study
- Belchertown Substation - NG Western MA Area Cluster StudySolar · 8.0 MW · built
- Mass Power IncreaseGas · 5.0 MW · built
- Holiday Hill Community WindOnshore wind · 5.0 MW · built
- Wilbraham substation - NG Western MA Area Cluster StudySolar · 4.0 MW · built
- Indian River PowerHydro · 1.3 MW · built
- Cresent Hydroelectric Project UprateHydro · 0.7 MW · built
- Combined CycleGas · 837 MW · withdrawn
- CC Administrative IncreaseGas · 550 MW · withdrawn
- Combined cycle (alt to Q442/472)Gas · 431 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem