ONSHORE WIND Β· WEST

Onshore wind project GI-0929, Meade County

Onshore wind project GI-0929, Meade County is a 120 MW onshore wind request withdrawn in the West interconnection queue, in Meade County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0929
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Maurine 115kV
Location
Meade County, South Dakota
Technology
Wind: 120 MW
Total requested
120 MW
Service type
NRIS and ERIS
Study phase
IAP
Queue status
Withdrawn
Entered queue
20 October 2009
Proposed online date
December 2011

Location

Marker shows the centre of Meade County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Meade County