πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

ONSHORE WIND Β· MISO

Onshore wind project J595, Clinton County

Onshore wind project J595, Clinton County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Clinton County, Indiana.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J595
Grid region
MISO (Midcontinent)
Connection point (POI)
Frankfort to New London 230kV Line Tap
Location
Clinton County, Indiana
Technology
Wind: 150 MW
Total requested
150 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
9 May 2016
Proposed online date
September 2018
Withdrawn
June 2017

Location

Marker shows the centre of Clinton County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Clinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem