United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 380D, Calhoun County
Solar project 380D, Calhoun County is a 20.0 MW solar request withdrawn in the Southeast interconnection queue, in Calhoun County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 380D
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- Altha - Gaskin (PS) 115kV line
- Location
- Calhoun County, Florida
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Withdrawn
- Entered queue
- 27 February 2020
- Proposed online date
- October 2027
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.
Other requests in Calhoun County
- Solar project 489, Calhoun CountySolar Β· 74.5 MW Β· in study
- Solar project 348A, Calhoun CountySolar Β· 350 MW Β· built
- Solar project 360A, Calhoun CountySolar Β· 74.5 MW Β· built
- Solar project 366A, Calhoun CountySolar Β· 74.5 MW Β· built
- Solar project 367A, Calhoun CountySolar Β· 74.5 MW Β· built
- Solar project IC-712, Calhoun CountySolar Β· 350 MW Β· withdrawn
- Battery storage project 613, Calhoun CountyBattery storage Β· 300 MW Β· withdrawn
- Battery storage project 614, Calhoun CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project IC-669, Calhoun CountySolar Β· 75.0 MW Β· withdrawn
- Solar project IC-599, Calhoun CountySolar Β· 74.9 MW Β· withdrawn
- Solar project IC-745, Calhoun CountySolar Β· 74.5 MW Β· withdrawn
- Solar project IC-744, Calhoun CountySolar Β· 74.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem