United States › Grid › Interconnection queues › West Virginia
SOLAR · PJMGlade Run Solar Energy Center
Glade Run Solar Energy Center is a 50.0 MW solar request withdrawn in the PJM interconnection queue, in Preston County, West Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-233
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Hazleton - Lake Lynn 138 kV
- Location
- Preston County, West Virginia
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 25 September 2020
- Proposed online date
- June 2028
- Withdrawn
- January 2025
Location
Marker shows the centre of Preston County; the queue data does not give exact sites.
Power plants in West Virginia · Transmission lines in West Virginia
Other requests in Preston County
- Solar + storage project AI1-211, Preston CountySolar + storage · 68.0 MW · in study
- Solar project AI2-182, Preston CountySolar · 12.0 MW · in study
- Maidsville CCGTGas · 1,270 MW · suspended
- Brandonville SolarSolar · 99.6 MW · suspended
- Gas project D08_W18, Preston CountyGas · 88.0 MW · withdrawn
- Onshore wind project P52, Preston CountyOnshore wind · 80.0 MW · withdrawn
- Onshore wind project AD1-068, Preston CountyOnshore wind · 80.0 MW · withdrawn
- Solar + storage project AH2-255, Preston CountySolar + storage · 70.0 MW · withdrawn
- Solar project AH2-260, Preston CountySolar · 70.0 MW · withdrawn
- Solar project AH1-593, Preston CountySolar · 65.0 MW · withdrawn
- Onshore wind project Q55, Preston CountyOnshore wind · 62.5 MW · withdrawn
- North Briery WFOnshore wind · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem