BATTERY STORAGE Β· MISO

Battery storage project J1971, Dane County

Battery storage project J1971, Dane County is a 45.0 MW battery storage request withdrawn in the MISO interconnection queue, in Dane County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2021 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1971
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMERICAN TRANSMISSION COMPANY
Connection point (POI)
Cardinal
Location
Dane County, Wisconsin
Technology
Battery: 45.0 MW
Total requested
45.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: Re-Study; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
30 November 2021
Proposed online date
October 2025
Withdrawn
June 2023

Location

Marker shows the centre of Dane County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Dane County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem