SOLAR + STORAGE Β· PJM

Solar + storage project AI1-098, Pickaway County

Solar + storage project AI1-098, Pickaway County is a 40.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Pickaway County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandonedAug 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AI1-098
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Circleville 138 kV
Location
Pickaway County, Ohio
Technology
Solar: 40.0 MW Β· Battery
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
30 August 2022
Proposed online date
October 2026
Withdrawn
August 2024

Location

Marker shows the centre of Pickaway County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Pickaway County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem