United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
GAS Β· MISOGas project J248, Outagamie County
Gas project J248, Outagamie County is a 675 MW gas request withdrawn in the MISO interconnection queue, in Outagamie County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2012 (completed)
- Withdrawn / abandonedNov 2012 (project stopped here)
- ConsentedNov 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J248
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Fox Plant 345kV Substation
- Location
- Outagamie County, Wisconsin
- Technology
- Gas: 675 MW
- Total requested
- 675 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 27 June 2012
- Agreement signed
- 2 November 2012
- Proposed online date
- October 2013
- Withdrawn
- November 2012
Location
Marker shows the centre of Outagamie County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Outagamie County
- Battery storage project J2326, Outagamie CountyBattery storage Β· 150 MW Β· in study
- Gas project G044, Outagamie CountyGas Β· 600 MW Β· built
- Gas project G225, Outagamie CountyGas Β· 60.0 MW Β· built
- Gas project G074, Outagamie CountyGas Β· 50.0 MW Β· built
- Other project G101, Outagamie CountyOther Β· 530 MW Β· withdrawn
- Gas project J293, Outagamie CountyGas Β· 496 MW Β· withdrawn
- Solar project J2148, Outagamie CountySolar Β· 200 MW Β· withdrawn
- Solar project J1567, Outagamie CountySolar Β· 150 MW Β· withdrawn
- Battery storage project J2074, Outagamie CountyBattery storage Β· 100 MW Β· withdrawn
- Gas project G231, Outagamie CountyGas Β· 60.0 MW Β· withdrawn
- Gas project G224, Outagamie CountyGas Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem