United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AF2-210, Pickaway County
Solar project AF2-210, Pickaway County is a 200 MW solar request withdrawn in the PJM interconnection queue, in Pickaway County, Ohio, connecting to DEOK.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-210
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DEOK
- Connection point (POI)
- Foster-Garver Road 345 kV
- Location
- Pickaway County, Ohio
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 25 March 2020
- Proposed online date
- December 2023
- Withdrawn
- March 2021
Location
Marker shows the centre of Pickaway County; the queue data does not give exact sites.
Other requests in Pickaway County
- Battery storage project AH2-228, Pickaway CountyBattery storage Β· 150 MW Β· in study
- Solar + storage project AH2-028, Pickaway CountySolar + storage Β· 44.0 MW Β· in study
- Solar project AH2-028A, Pickaway CountySolar Β· 20.0 MW Β· in study
- Other project AH2-006, Pickaway CountyOther Β· 14.2 MW Β· in study
- Circleville Solar EnergySolar Β· 70.0 MW Β· suspended
- Buckeye Plains SolarSolar Β· 49.9 MW Β· built
- Pickaway County II SolarSolar Β· 49.9 MW Β· built
- Pickaway County SolarSolar Β· 49.9 MW Β· built
- Buckeye Plains II SolarSolar Β· 49.9 MW Β· built
- Darby Generation Station Units 1-6Gas Β· 9.0 MW Β· built
- Darby Generating StationGas Β· 9.0 MW Β· built
- Pickway #5Coal Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem