ONSHORE WIND Β· MISOOnshore wind project G851, Murray County
Onshore wind project G851, Murray County is a 250 MW onshore wind request withdrawn in the MISO interconnection queue, in Murray County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2007 (completed)
- Withdrawn / abandonedJun 2008 (project stopped here)
- ConsentedJun 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G851
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- GRE Lake Sarah 115 kV Substation
- Location
- Murray County, Minnesota
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 24 August 2007
- Agreement signed
- 24 June 2008
- Proposed online date
- April 2010
- Withdrawn
- June 2008
Location
Marker shows the centre of Murray County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Murray County
- Solar project J874, Murray CountySolar Β· 150 MW Β· under construction
- Battery storage project J1045, Murray CountyBattery storage Β· 20.0 MW Β· under construction
- Onshore wind project J2104, Murray CountyOnshore wind Β· 230 MW Β· in study
- Onshore wind project J2447, Murray CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J2346, Murray CountyOnshore wind Β· 200 MW Β· in study
- Solar project J2309, Murray CountySolar Β· 100 MW Β· in study
- Onshore wind project G060, Murray CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project G057, Murray CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G037, Murray CountyOnshore wind Β· 36.0 MW Β· built
- Onshore wind project G272, Murray CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project G252, Murray CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project G492, Murray CountyOnshore wind Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem