United States βΊ Grid βΊ Interconnection queues βΊ Virginia
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Virginia (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Tidewater Solar Projects Solar |
91.0 MW | Withdrawn / abandoned |
| Solar project AB1-070, Greensville County Solar |
80.0 MW | Withdrawn / abandoned |
| Fort Powhatan Solar Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AB1-054, Southampton County Solar |
60.0 MW | Withdrawn / abandoned |
| Solar project AA2-154, Southampton County Solar |
20.0 MW | Withdrawn / abandoned |
| Battery storage project AA2-129, Accomack County Battery storage |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-163, Sussex County Solar |
20.0 MW | Withdrawn / abandoned |
| Charles City Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Montross Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Chesapeake Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AB1-028, Southampton County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-158, Louisa County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AB1-097, Rockingham County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-087, Southampton County Solar |
20.0 MW | Withdrawn / abandoned |
| Gas project AB1-117, Fluvanna County Gas |
17.3 MW | Withdrawn / abandoned |
| Stevensburg Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Solar project AB1-159, Surry County Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project AB1-155, Surry County Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project AB1-067, Orange County Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project AB1-059, Hanover County Solar |
5.0 MW | Withdrawn / abandoned |
| Saltville-Holston 34.5kV Solar Facility Solar |
5.0 MW | Withdrawn / abandoned |
| Saltville-Holston 34.5kV Solar Facility Solar |
5.0 MW | Withdrawn / abandoned |
| Boykins Solar Solar |
4.5 MW | Withdrawn / abandoned |
| Battery storage project AB1-022, Louisa County Battery storage |
2.0 MW | Withdrawn / abandoned |
| Other project AA2-185, Prince William County Other |
1.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)