United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project AA2-129, Accomack County
Battery storage project AA2-129, Accomack County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Accomack County, Virginia, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedJun 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA2-129
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- New Church 138kV
- Location
- Accomack County, Virginia
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2015
- Proposed online date
- December 2016
- Withdrawn
- June 2018
Location
Marker shows the centre of Accomack County; the queue data does not give exact sites.
Other requests in Accomack County
- Battery storage project AH2-050, Accomack CountyBattery storage Β· 20.0 MW Β· in study
- Switchgrass Solar 1Solar Β· 49.0 MW Β· suspended
- Switchgrass Solar 1Solar Β· 20.0 MW Β· suspended
- Scout Storage IBattery storage Β· 9.0 MW Β· suspended
- TasleyOther Β· 6.7 MW Β· built
- Solar project AD2-032, Accomack CountySolar Β· 150 MW Β· withdrawn
- Solar project AE2-328, Accomack CountySolar Β· 100 MW Β· withdrawn
- Solar project AG2-258, Accomack CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project Y1-029, Accomack CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project W3-054A, Accomack CountyOnshore wind Β· 95.0 MW Β· withdrawn
- Solar project AE2-233, Accomack CountySolar Β· 94.0 MW Β· withdrawn
- Solar project AE1-073, Accomack CountySolar Β· 75.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem