United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Virginia (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11576 MW
Active in queue1,676 MW29 requests
Agreement signed1,100 MW18 requests
Withdrawn18912.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Courthouse Solar
Solar Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
167 MWIn study Charlotte, VAPJM Mar 2020target 2031
Wild Rose Solar Project
Solar Β· Wild Rose Solar Project, LLC
90.0 MWIn study Nelson, VAPJM Aug 2020target 2024
Brunswick Battery Storage
Battery storage Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
75.0 MWIn study Brunswick, VAPJM Sep 2020target 2031
Cerulean Solar and Mulberry BESS
Solar Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
62.0 MWIn study Richmond, VAPJM Feb 2020target 2031
Moon Corner Solar
Solar Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
60.0 MWIn study Richmond, VAPJM Sep 2020target 2031
Redbud-Gaylord 34.5 kV
Solar
30.0 MWPaused / redesign Frederick, VAPJM Jul 2020target 2026
Amelia Energy Facility
Solar Β· Amelia Energy Facility, LLC
25.0 MWIn study Amelia, VAPJM Feb 2020target 2022
Amelia Energy Facility
Solar Β· Amelia Energy Facility, LLC
20.0 MWIn study Amelia, VAPJM May 2020target 2023
Switchgrass Solar 1
Solar
20.0 MWPaused / redesign Accomack, VAPJM Feb 2020target 2025
Jarratt Energy Facility 2
Solar Β· Jarratt Energy Facility, LLC
18.0 MWIn study Greensville, VAPJM Mar 2020target 2022
Scout Storage I
Battery storage
9.0 MWPaused / redesign Accomack, VAPJM Jan 2020target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)